Home » , » Krapivinskaya Hydro Power Plant

Krapivinskaya Hydro Power Plant


The construction of the Krapivinskaya hydro power plant began in 1975. In 1989 due to extensive struggle with ecological problems the construction was stopped. Water engineering system was abandoned, no construction conservation conducted. During the following years the state of the complex only worsened. The equipment was partially stolen. But the further fate of the complex is still unknown.

Unfinished dam.


The signature – “Perestroyka is the time of brave decisions and active actions”.



A very deep well of unknown predestination.














There supposed to be a road on the dam.



via lay_zzz

0 comments:

Post a Comment

 
Support : Venus Net | Pagak City
Copyright © 2013. asian ladies - All Rights Reserved